The installation diagram in the manual is for reference only. Determine the actual installation scheme according to the real operating environment.
Unpacking and inspection
1
Prepare tools
Prepare a knife and scissors, and wear protective gloves.
2
Remove the packaging
Remove the wrapping film and packing belt, then the carton, and take out the air conditioner.
3
Check the contents
Check the accessory list and accessory bags in the carton and confirm the air conditioner model is correct.
- If the product will not be installed right away or must be transported elsewhere, repack it after inspection.
- Recycling the packaging materials is recommended.
Mechanical installation
Tool required: Phillips screwdriver.1
Prepare the cutout
Choose the cutout location on the cabinet according to the drilling diagram, remove the shaded area and make the mounting hole.
2
Fix the unit
Bring the unit flange against the cabinet door and fix it firmly to the mounting surface with M5 screws.
3
Check the installation
Check that the unit is level and firmly fixed.
