Totem Digital smart waste bins are delivered and installed on site by the Totem Digital team. This page explains how to prepare the location before delivery and what is checked at first start-up.
The mounting steps below are a general guide. Exact anchor dimensions and the start-up procedure are confirmed by the installation team for each model.

Choosing the location

  • Direct sunlight: choose a spot where the solar panel gets sun for most of the day, without shade from buildings or trees.
  • Flat, stable surface: concrete or paving able to carry the weight of the bin (50 kg, 105 kg or 150 kg, depending on the model).
  • Access for emptying: leave free space in front of the doors so they open fully and bags can be removed.
  • Space for the sensor: keep the area in front of the automated compartment clear, so fixed objects or passers-by do not trigger the presence sensor.
  • 4G signal: if you ordered 4G monitoring, check mobile coverage at the location.

Mounting

1

Prepare the surface

Clean and level the mounting area. For permanent installations in public spaces, a concrete foundation or slab is recommended.
2

Position the bin

Place the bin with the solar panel facing south (in the northern hemisphere) for maximum charging.
3

Anchor to the floor

Fix the bin to the ground through the floor bracket, using plugs or anchors suited to the surface. Anchoring prevents tipping and theft.
4

Fit the bags

Open the service door and fit the bag or inner liner in each compartment.

First start-up

1

Power on

The installation team switches on power from the internal battery. Check that the LED lighting turns on.
2

Test the sensor

Walk up to the automated compartment and check that the door opens, then closes by itself after you move away.
3

Check the indicators

The status indicator should show the bin as available (blue on WYC models, green on the TPV2209).
4

Connectivity (optional)

If you have the 4G module, insert a SIM card (not included) and check that data reaches the monitoring system.
In the first days after installation, let the battery charge fully in sunlight before heavy use.